Powder Project Logo

A Forest Service road closed to vehicular traffic that holds snow through the winter months.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.9

Miles

3.0

KM

Ski Line

7,515' 2,291 m

High

6,646' 2,026 m

Low

16' 5 m

Up

885' 270 m

Down

9%

Avg Slope (5°)

23%

Max Slope (13°)
Type: Backcountry or Sidecountry

Overview

Once you've made it up as far as you're willing to go, simply turn around for a pleasant and mellow return trip.

Description

This area is the closest place to Colorado Springs to find low angle skiing with a dependable base through the winter months. Skin as high up High Drive as you like or until you run out of snow. While the portion shown here is mostly reliable, continuing on the road becomes sun exposed and snow can be less reliable.

Contacts

Shared By:

Dan Allen

Trail Ratings

  4.0 from 4 votes

#351

Overall
  4.0 from 4 votes
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Ski Line Rankings

#123

in Colorado

#351

Overall
43 Views Last Month
1,610 Since Jan 3, 2017
Easy Easy

100%
0%
0%
0%
0%
0%

Photos

Tenney Crags from High Drive.
Jan 3, 2017 near Manitou…, CO

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Nov 11, 2024
Patrick Profeta
Icyyy concrete rn. Up to the 1st mile has coverage, most of the second does as well but a couple spots that are super thin and will be melted out soon 3.1mi — 0h 53m
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.